Feb. 11th, 2008

raffaellasworld: (Default)
What a busy but fulfilling weekend.
Saturday I got up early to head to Day of Dance, help with decoration and help in the kitchen. They were short handed with several of the anticipated helpers not showing up so I played in the kitchen for most of the day. One of the tasks I helped with was making all the almond milk and I realized that I had never documented steps of the process before so I grabbed my camera and took a few shots.
Almond milk is made by taking blanched and peeled almonds, pounding or pureeing them with water then sieving out the almonds solids. In period they likely would have used a mortar and pestle for this, but I've found a blender to be quite effective. Each batch I'd run in the blender was 1 cup blanched and peeled almonds, and 3 cups tepid water- blended on highest setting for approximately two minutes, then run through a cheese cloth and strainer. I'd then lift out the cheese cloth, squeeze  out all the remaining liquids and set the almonds solids aside to be used as a thickening agent in another dish.

I was only slightly bummed about missing the Amoroso, as I seriously needed the hands on kitchen geek time. There's a lady who is trying to get some dancing started in Wyewood who's interested in the Italian dances, so it sounds like I may have lots of later chances to get more practice with this dance, so all in all it was a wonderful and productive day. The little quails came out beautifully, as did the lemon sauce. Bashira did a wonderful job, and I think she outdid herself with this one.

Sunday morning I met with Countess E and Mort, and we got a lot of planning and full tilt food geeking done. If possible I'm even more excited now about how the all-food all the time weekend is shaping up. After that I went to Holly's, hung out for a bit and picked up some more needles for a largess project I'm working on for Duchess Angharad, then helped her go through her room a bit. 
raffaellasworld: (Default)

I just got a call from the other contruction company doing the rest of my bathroom tear out and remodel. They will be starting Wednesday (i.e. the day after tomorrow) and have given me the long estimate of two weeks, but say if everything goes well it should be done long before that. 

So, reminder to myself, I need to go to lowes or home despot tonight and pick out (and price for my records): 
linolium
light fixture 
paint
faucet & sink 
formica

I need to take pictures and send them to the manager so they can have someone go fetch everything at once. 

So by the end of the month the bathroom should be totally done! Now I still just have to decide on the kitchen cabinets & counters or if I just want to wait and do the rest right before I sell it so I don't have to stress about possible damage from renters.

raffaellasworld: (Adder cunning plan)
Wow, it seems like it's been way more than a week since Mort emailed me with the idea, it's starting to look like a more fleshed out plan everyday.
raffaellasworld: (Default)
Sorry for the deluge, but I wanted to post pictures of the choices for the upstairs bathroom so they'll be recorded for posterity and easily accessible to me.                                                                                              

Profile

raffaellasworld: (Default)
raffaellasworld

September 2011

S M T W T F S
    123
45678 910
11121314 151617
18192021222324
252627282930 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 29th, 2025 04:36 pm
Powered by Dreamwidth Studios